Below are shots of the pieces as I did the final detailing as well as a shot showing the assembled board elements as it stands now. Next part of this project depends on my time. The central building structure has about 5 floors that need to be bulked and detailed and the elevators and 2nd lighting set need to be set up.
Total Pageviews
Friday, 1 August 2014
Launch Bay Elevated Walkway: Gantry supports (complete)
As the title says they are pretty much done. I will be adding a relatively simple control panel to the top of each but essentially this part of the work is done. Now for a much needed break from this project. I know I will do more on this before the summer is out.
Below are shots of the pieces as I did the final detailing as well as a shot showing the assembled board elements as it stands now. Next part of this project depends on my time. The central building structure has about 5 floors that need to be bulked and detailed and the elevators and 2nd lighting set need to be set up.
Below are shots of the pieces as I did the final detailing as well as a shot showing the assembled board elements as it stands now. Next part of this project depends on my time. The central building structure has about 5 floors that need to be bulked and detailed and the elevators and 2nd lighting set need to be set up.
Subscribe to:
Posts (Atom)