Below are shots of the pieces as I did the final detailing as well as a shot showing the assembled board elements as it stands now. Next part of this project depends on my time. The central building structure has about 5 floors that need to be bulked and detailed and the elevators and 2nd lighting set need to be set up.
Total Pageviews
Friday, 1 August 2014
Launch Bay Elevated Walkway: Gantry supports (complete)
As the title says they are pretty much done. I will be adding a relatively simple control panel to the top of each but essentially this part of the work is done. Now for a much needed break from this project. I know I will do more on this before the summer is out.
Below are shots of the pieces as I did the final detailing as well as a shot showing the assembled board elements as it stands now. Next part of this project depends on my time. The central building structure has about 5 floors that need to be bulked and detailed and the elevators and 2nd lighting set need to be set up.
Below are shots of the pieces as I did the final detailing as well as a shot showing the assembled board elements as it stands now. Next part of this project depends on my time. The central building structure has about 5 floors that need to be bulked and detailed and the elevators and 2nd lighting set need to be set up.
Subscribe to:
Post Comments (Atom)
Reeeealy nice work, Going to enjoy seeing you paint and complete this.
ReplyDeleteThank you.
ReplyDeleteI know the end result will be worth it but the pace can sometimes be trying.
I will try to keep up with it for the next few weeks if I can as I would like to prime the boards before the colder Fall/Winter weather sets in.