Total Pageviews

Friday 1 August 2014

Launch Bay Elevated Walkway: Gantry supports (complete)

As the title says they are pretty much done. I will be adding a relatively simple control panel to the top of each but essentially this part of the work is done. Now for a much needed break from this project. I know I will do more on this before the summer is out.

Below are shots of the pieces as I did the final detailing as well as a shot showing the assembled board elements as it stands now. Next part of this project depends on my time. The central building structure has about 5 floors that need to be bulked and detailed and the elevators and 2nd lighting set need to be set up.












2 comments:

  1. Reeeealy nice work, Going to enjoy seeing you paint and complete this.

    ReplyDelete
  2. Thank you.

    I know the end result will be worth it but the pace can sometimes be trying.

    I will try to keep up with it for the next few weeks if I can as I would like to prime the boards before the colder Fall/Winter weather sets in.

    ReplyDelete